Developing Bellechasse-­Timmins Gold Deposit
New Discovery Resulting in a 20KM Mineralized Gold Belt
  • Demo Video
  • Private Messages
  • Edit My Profile
  • View/Edit Portfolio

AGORACOM News Flash

AGORACOM Wire - Wednesday February 22nd, 2012

Donner Metals Ltd. (TSX VENTURE:DON)(FRANKFURT:D4M) *CLIENT*

Development to Reach the McLeod Zone a Year Ahead of Schedule Read Press Release  |  New Drilling Continues to Demonstrate Potential of Matagami Read Press Release

Watch the Donner Metals CEO Interview

Pacific North West Capital (TSX:PFN) Completed the First Component of the Environmental Baselines Studies on the River Valley PGM Project, Sudbury, Ontario Read Press Release  |  HUB  |  Profile *CLIENT*

Graphite: The Miracle Material of the Future Read More

AGORACOM Launches GraphiteStocksBlog.com

GraphiteStocksBlog.com will provide the industry with valuable content that includes expert commentary and analysis, industry events and developments, videos, Skype interviews, webcasts, sponsor content and even posts from astute online investors – an industry first.

Discover Graphite Today

AGORACOM WELCOMES OUR NEWEST SPONSOR!!

HUB WHY GNH? / HOME

Message: Golden Hope Intersects 6140 g/t Au (197.4 oz/t Au) of Gold Over 1 Metre

080_3_amigos
Rank: [?]
President
Points: [?]
9521
Rating: [?]
Votes: 224 Score: 3.7
  • Currently 3.8/5 Stars.
Did you know? You can earn activity points by filling your profile with information about yourself (what city you live in, your favorite team, blogs etc.

Golden Hope Intersects 6140 g/t Au (197.4 oz/t Au) of Gold Over 1 Metre

posted on Jan 26, 12 08:42AM

Golden Hope Intersects 6140 g/t Au (197.4 oz/t Au) of Gold
Over 1 Metre at Bellechasse-Timmins, Quebec

January 26, 2012

Montreal, January 26, 2012 /CNW/ - Golden Hope Mines (TSX VENTURE: GNH)(Pink Sheets: GOLHF) – Golden Hope Mines Limited is pleased to announce further assay results from its Summer/Fall 2011 Drill Campaign in South-eastern, Quebec. The company received results from 3 holes including BD2011-165, 166 and 167.

Result highlights are presented in the table below.

Hole Number

From (m)

To (m)

Length (m)

Au (g/t)

BD2011-166

260

385

125

0.52

Including

353

385

32

1.29

BD2011-167

282

335

53

0.63

Including

282

297

15

1.50

Including

329

335

6

1.25

BD2011-167

374

380

6

1024

Including

374

375

1

1.87

Including

375

376

1

6140

Including

376

380

4

0.59

The lengths are core length and the assays are uncut.

Hole BD2011-167 was drilled to test a possible extension of the T1 Zone at depth to the northeast. The hole intersected a 40% quartz-filled breccia with coarse visible gold from 370m to 377m in the core at a vertical depth of 270m. The section between 374m and 380m returned above background gold values including 1 metre that gave a preliminary assay of 6140 g/t Au (50g gold Fire Assay with gravimetric finish).

The gold assay was confirmed by total pulp metallic treatment of the entire reject from the preliminary assay. 0.414kg of reject returned 6060 g/t Au and 0.997 kg of reject returned 6890 g/t Au.

A photo of the core from this intersection was previously reported in the November 18, 2011 press release and can be viewed at http://cnw.ca/6EnWg

"We are extremely pleased with these latest results. As we continue our aggressive drill campaign, we keep encountering significant mineralization. We are working to define the area around Bellechasse-Timmins and these results combined with the previous results in the 2011 campaign, provide us with the motivation to push forward enthusiastically. Results such as those encountered in hole 167 are certainly very encouraging and need to be interpreted within the context of the entire deposit" states Frank Candido, President, Golden Hope Mines Limited.

Following the exceptional visuals on hole BD2011-167, SGS recommended two wedges, holes BD2011-167A and BD2011-167B with the objective of defining the orientation of the brecciated zone. Samples from the wedges have been shipped to the SGS Mineral Services laboratory in Toronto for assaying.

Hole BD2011-165 was drilled to confirm the closing of the T1 Zone to the south west near surface and did not intersect significant gold values.

Samples were prepared and analyzed at SGS Minerals Services of Toronto, Ontario (Don Mills laboratory). Analysis for gold was done on one half of core samples following FAI525 fire assay procedure .

Golden Hope drilled 27 holes or approximately 12000 metres at Bellechasse-Timmins in 2011. Including the holes reported above, the company has 16 of 27 holes from the 2011 campaign which remain outstanding at Bellechasse-Timmins..

Since January 4, 2012, Golden Hope has currently drilled 3 holes or approximately 1000 metres at Bellechasse-Timmins as part of the Winter 2012 Drill Campaign. The company expects to be drilling throughout the winter. All outstanding drill results will be reported when they are received and interpreted.

Claude Duplessis, P.Eng and Claude Bisaillon, P.Eng. are acting as independent qualified persons (QP) for Golden Hope in compliance with National Instrument 43-101 and have reviewed the technical contents of this press release.

James E. Tilsley, P.Eng is acting as the qualified person (QP) for Golden Hope in compliance with National Instrument 43-101 and has reviewed the technical contents of this release.
Forward-Looking Information:

New Message

Please login to post a reply

AGORACOM Quick Tips

Small & Micro Cap 2.0 Blog by AGORACOM Members Read It Now

President's D.D.

A New Belt Emerging? read more